Progress of Current Mining Projects
Projects
Minera Tiwanacu SA–Nazareno Project
Located in La Paz, the Nazareno project is an excellent prospect because of its high quality minerals and large volume.
More
Highlights
- High zinc grades: the Nazareno vein has an average width of 2 meters and zinc grades between 12% and 18%
- Large volume: Nazareno vein’s length is 1.6 Kilometers. The team has estimated a total of 5.4 million tons with an approximate grade of 12% Zn. If confirmed, this would amount to a total of 1.4 million troy ounces of gold, making the deposit a world-class project
- Simple concentration process with high recoveries: lab tests have shown excellent metallurgical recoveries of 94% while concentrating to 49% Sb
Financials
-
The Project will need a total Investment of 258m USD
-
Considering the geological studies, we come to a resource of 881,038 FMT of Zinc and the gross value with the actual Zinc price is 2,473m USD
-
The plan is to extract 7.3m MT in 12 years with a head grade of 12% of Zinc on average. The project generates a Gross Profit of 173 USD per MT
-
The IRR of the project is 51% after 12 years of operation. The NPV is 2731m USD using a DSCR of 12%. The total Cash Flow is 1,306m USD
Projects
Empresa Minera del Sudoeste S.A. – Illampu Project
Illampu gold exploration project, located in Larecaja province, San Antonio de Millipaya canton, La Paz, Bolivia.
More
Highlights
- EMSUDOESA and MINERA BURDINA controls a total area of 675 hectares. (27 mining grids – 6 Jucumarini, 6 Marca Marcani, 15 San Roque)
- You can access 115 km paved roads and 17 km on the dirt road from La Paz
- Good metallurgical recoveries have been obtained in different tests: 85% in flotation, 80% in direct leaching, and 89% in bioleaching
- Two kilometric structures have been found:
- The first is estimated at 1.5 Kms long, 1 meter wide on average (with several gaps), 400 meters deep on average, and 10 g / t. of Au per TM (the top of the sinkhole has 57.2 g / t and 1.4% of Co)
- The second is estimated to be 2 Kms long within the contracted area, 40 meters wide and an average of 400 meters deep
- If both structures are confirmed, a resource of 4.3 million ozt of Au has been estimated
- Permits
- Exploration (Allows 300 tons of production per month)
- Social Authorization with the Marca Marcani Community
Financials
- The Project will need a total Investment of 212m USD
- Considering the geological studies, we come to a resource of 5.6 million Troy Ounces of gold and the gross value with the actual gold prices is 10,170m USD
- The plan is to extract 58 million MT in 12 years with a head grade of 3g/t of Au or 0.10/ozt Au in average. The project generates a Gross Profit of 130 USD per MT
- The IRR of the project is 157% after 12 years of operation. The NPV is 1,652m USD using a DSCR of 12%
Projects
Kaparipin Inversiones – Parco Project
Kaparipin Inversiones wholly owns the antimony Parco Project in Oruro, Bolivia and is seeking an investor to continue exploration and development of the mine and potential processing in Poopo, Oruro.
More
Highlights
- High grade antimony project
- High antimony content: the most important veins have 15% Sb in 0.82 meters width
- Low impurity contents: lead and arsenic, both lower than 0.10%
- Potential high volume: a stockwork has been identified, and we estimate 11 million metric tons with a grade of approx. 4% Sb, equivalent to 3 million troy ounces of gold, and this estimate does not consider other important identified veins
- High recovery in floatation: metallurgical tests have shown excellent recoveries of 92% while concentrating to 55% Sb
Financials
- The Project will need a total Investment of 134.43m USD
- Considering the geological studies, we come to a resource of 450.000 of Antimony and the gross value with the actual Antimony prices is 2,511m USD
- The plan is to extract 11.2 MT in 12 years with a head grade of 4% Sb. The project generates a Gross Profit of 188 USD per MT
- The IRR of the project is 73% after 12 years of operation. The NPV is 424m USD using a DSCR of 12%
Projects
Progress of Current Mining Projects
MTT’s team has a strong track record of advancing Bolivian mining investments through development, production and expansion, but more importantly, navigating through the Bolivian legal and regulatory space